CM Costruzioni

Wastewater and drinking water treatment

At the heart of C.M. Costruzioni’s work: construction, expansion and refurbishment of water treatment plants.

Activities and expertise

From construction to maintenance

More than thirty years of experience from the companies behind C.M. Costruzioni brings together plant engineering, structural expertise and metal fabrication.

Construction and expansion

New wastewater and drinking water treatment plants, extensions to existing facilities and works for water and waste treatment.

Plant upgrades and maintenance

Plant upgrades and refurbishment, scheduled and corrective maintenance, pumping and lifting systems.

Integrated works

Tanks, hydraulic works and steel structures developed alongside mechanical and plant systems.

SOA qualification and company documents

Plant engineering, steelwork and prefabrication

Innovation and integrated expertise

C.M. Costruzioni combines steel prefabrication with experience in water and environmental treatment plants.

This combination enables, for example, the design and construction of prefabricated steel tanks, walkways, roofs and technical rooms fully integrated with mechanical and plant systems, reducing time on site and supporting high construction quality.

Bespoke equipment shelters and technical rooms
Tank, steel structure and plant connections Illustrative diagram: an open steel tank is connected by pipes to a pump unit beneath a steel roof. A control panel completes the technical room.
  1. 01 Prefabricated tank
  2. 02 Steel structure
  3. 03 Plant connections

Projects

Treatment plants and works

The Comacchio, Piacenza d’Adige and Fiorenzuola d’Arda sites, followed by other projects in the company archive.

Reagent area at the wastewater treatment plant

Comacchio

New reagent storage and dosing area for biological wastewater treatment.

The upgrade includes two reinforced-concrete containment tanks and three GRP tanks of 25 m³ each: two for the carbon solution supporting nitrogen removal and one for the phosphorus-removal reagent. Connections to the dosing skids, GRP stairs and platforms complete the area.

Systems tested in February 2026

Drinking water treatment plant

Piacenza d’Adige

Participation in the upgrade and refurbishment of the drinking water treatment plant to improve the reliability of the water supply and integrate new supply sources.

The project includes a new drinking water storage tank, refurbishment of the final pumping stage and pipework, discharge treatment, and upgrades to electrical and remote-control systems. It forms part of the programme to replace PFAS-contaminated sources, integrating supplies from the Camazzole well field to the Montagnana area.

Nearing completion in April 2026

Wastewater treatment plant upgrade

Fiorenzuola d’Arda

Upgrade of the biological process to remove nitrogen and the main pollutants from wastewater.

C.M. Costruzioni’s works include new water treatment lines designed for 21,500 population equivalent. The plant’s authorised capacity remains unchanged; the project considers incoming flows of up to five times the average daily flow.

Works completed at the end of 2025

Other treatment plants and works

Wastewater treatment plants, pre-treatment and plant components: a selection of projects documented in the company archive.

Upgrade and expansion of the Ceggia wastewater treatment plantUpgrade and expansion of the Ceggia wastewater treatment plant

Ceggia (VE)

Existing plant with a nominal capacity of 5,000 population equivalent; works to increase capacity to 6,750 population equivalent and adapt the treatment process to applicable regulatory limits, including removal of 75% of the incoming nitrogen load.

Client: Veritas S.p.A.

Open 3 images

Projects

Photographs: Water treatment

Contact

Contact us
for enquiries

info@cmcostruzionisrl.eu